Features

Demolition of Existing Paint Mixing Room

Design of New One–Story Structure (+/- 713 Sq. Ft.)

Pre-Engineered Metal Building w/ Pitched Metal Roof to Match Existing Building

Prefabricated Paint Mix Booth for Mixing of Paints

Design Meets All Applicable NFPA Requirements

Approved Automatic Fire Protection System

Services Provided

Architectural Services

Construction Administration

PROJECT INFORMATION

This project involved the demolition and replacement of the existing Paint Mix Room at Building B-134 of the South Florida Water Management District’s West Palm Beach Field Station. The existing pre-engineered metal structure was fully removed and replaced with a newly constructed, one-story, 713-square-foot pre-engineered metal building.

UPGRADED PAINT MIX ROOM DESIGNED FOR LONG-TERM PERFORMANCE

Designed to enhance durability and safety, the new Paint Mix Room provides an upgraded, code-compliant space for paint handling and preparation activities. The project improves overall site operations and supports the ongoing maintenance efforts of the district.